Timur Gamzatov

Director
RusHydro Dagestan Branch – Dagestan Territorial Generating Company

RusHydro Dagestan branch manages 8 hydropower stations and 7 SHPPs with the total installed capacity 1785.5 MW in the Dagestan Republic. Overall volume of generated electricity amounts to 5086m kWh annually.
The mission of Dagestan branch is to ensure reliable operation of hydropower stations and generation of clean energy on the basis of efficient utilization of Dagestan hydro resources.

Our brands:

top